tank removed from spot overlay

Above Ground & Underground Tank Removal

Removal of above-ground storage tanks (ASTs) and underground storage tanks (USTs) requires careful planning, regulatory awareness, and disciplined excavation practices. HM Environmental Services, Inc. provides cleaning and removal services for tanks of various sizes and contents throughout Michigan and the Midwest.

We support industrial facilities, commercial and residential properties, consultants, and municipalities with safe, compliant tank removal services.


Reach Outabove ground tanks being worked on

Comprehensive Tank Removal Services

HM Environmental is experienced in removing tanks containing:

Our scope of work may include:

  • Gasoline
  • Diesel fuel
  • Heating oil
  • Plating wastes
  • Waste treatment materials
  • Unknown waste
  • Tank cleaning and product removal
  • Disconnection and removal of associated piping and dispensers
  • Controlled excavation
  • Removal, transportation, and disposal of tank contents and tank shells
  • Sampling and documentation as required
  • Backfill and site restoration
tank above ground being removed
blue textured for right side

Careful Excavation & Documentation

Tank removal often involves sensitive site conditions, including active facilities, structural considerations, or regulatory oversight. In certain projects, excavation may require hand exposure of piping and connections to ensure structural integrity and proper documentation.

We coordinate closely with consultants, engineers, and regulators to ensure removal procedures meet applicable standards and that documentation is properly maintained.


Regulated Waste Management

Tank removal can generate impacted soils, residual liquids, and other regulated materials. HM Environmental is licensed to manage hazardous and non-hazardous waste and provides:

  • Waste sampling and characterization
  • Manifest preparation
  • Proper containment and labeling
  • Transportation to approved disposal facilities

Our integrated services allow clients to manage removal and disposal through a single, coordinated contractor.

Safety-Driven Execution

All personnel assigned to tank removal projects are OSHA 40-hour HAZWOPER trained with required annual refresher training. Excavation safety procedures, hazard assessments, and site-specific planning are implemented prior to mobilization.

We are committed to performing tank removal work in a manner that protects personnel, property, and the surrounding environment.


Planning a Tank Removal Project?

If your facility requires the removal of an above-ground or underground storage tank, HM Environmental Services, Inc. is prepared to provide structured and compliant tank removal services.

Reach Out